The Lake
Report
November 11 - 30, 2002


We have a propane air conditioner!
We
have propane in our tanks!
-

We have the studding framing the
cement walls!
-

We have wind proof insulation sprayed
in (2 inches thick)!
-


We have new windows and doors installed
and insulated!
-


We have a new window in the upstairs
living room and also in the dining room!
-

Our furnace is working!
- The workers had to ask
us to turn it down even though we had only set it at 20!
-


We have stairs and wall partition
framing!
-
- We have drains to the
septic system!
-

This is our tankless hot water heater
waiting for the electrician to connect on Dec. 2!
-

At last we have a flushing toilet
in our new upstairs bathroom!